PIB Analysis 03-02-23 Part 1

PIB Analysis 03-02-23 – Part 1

Inter-Linking of Rivers

  • The National Water Development Agency (NWDA) has been entrusted with the work of inter-linking of rivers under National Perspective Plan (NPP).
  • NPP has two components, viz., Himalayan Rivers Development Component and Peninsular Rivers Development Component.
  • 30 link projects have been identified under NPP.

Peninsular Component

Sl. No Name of the link Status States benefited Annual Irrigation (Lakh ha) Hydro power

(MW)

1 Mahanadi (Manibhadra) – Godavari (Dowlaiswaram) link FR completed Andhra Pradesh (AP) & Odisha  

4.43

 

450

Alternate Mahanadi (Barmul) – Rushikulya –Godavari (Dowlaiswaram) link FR completed AP & Odisha 6.25

 

210 (MGL)% + 240**
2 Godavari (Polavaram) – Krishna (Vijayawada) link FR completed AP 2.1
3 a.)Godavari (Inchampalli) – Krishna (Nagarjunasagar) link  

FR completed

 

Telangana 2.87 975+

70=

1,045

b.) Alternate Godavari (Inchampalli) – Krishna (Nagarjunasagar) link *  

DPR completed

Telangana 3.67 60
4 Godavari (Inchampalli) – Krishna (Pulichintala) link FR completed Telangana & AP 6.13

(1.09 +5.04)

27
5 a.)Krishna (Nagarjunasagar)- Pennar (Somasila ) link  

FR completed

 

 

AP

 

5.81

 

90

b.)Alternate Krishna (Nagarjunasagar) – Pennar (Somasila ) link *  

DPR completed

AP 2.94 90
6 Krishna (Srisailam) – Pennar link FR completed 17
7 Krishna (Almatti) – Pennar link FR completed AP & Karnataka 2.58

(1.9+0.68)

13.5
8 a.)Pennar (Somasila) – Cauvery (Grand Anicut) link FR completed

 

 

AP, Tamil Nadu & Puducherry 4.91

(0.49+ 4.36 +0.06)

b.) Alternate Pennar (Somasila) – Cauvery (Grand Anicut) link *  

DPR completed

AP, Tamil Nadu & Puducherry 2.83

(0.51+2.32)

9 Cauvery (Kattalai) – Vaigai -Gundar link DPR completed Tamil Nadu 4.48
10 Parbati –Kalisindh – Chambal link FR completed

 

 

 

Madhya Pradesh (MP) & Rajasthan @Alt.I = 2.30 Alt.II = 2.20
 

 

Parbati – Kuno – Sindh link. $

 

 

PFR completed

 

 

 

MP & Rajasthan

Integration of modified Parbati – Kalisindh-Chambal link with Eastern Rajasthan Canal Project (ERCP) PFR completed MP & Rajasthan

 

  • % MGL: Mahanadi Godavari Link
  • **Benefit from six projects of Govt. of Odisha.
  • @ Alt I- Linking with Gandhisagar Dam; Alt. II- Linking with Rana Pratapsagar Dam
  • Alternate study to divert unutilized waters of Godavari river carried out and DPR of Godavari (Inchampalli/ Janampet) – Krishna (Nagarjunasagar) – Pennar (Somasila) –
  • Cauvery (Grand Anicut) link projects completed. Godavari-Cauvery (Grand Anicut) link project has been prepared comprising Godavari (Inchampalli / Janampet) -Krishna
  • (Nagarjunasagar), Krishna (Nagarjunasagar)- Pennar (Somasila) and Pennar(Somasila)-Cauvery(Grand Anicut) link projects.
  • *** Further studies are not taken up since after implementation of Yettinahole project by Govt. of Karnataka, no surplus water is available in Netravati basin for diversion through this link.
  • $ Integration of Eastern Rajasthan Canal Project of Rajasthan and Parbati – Kalisindh-Chambal link

 

Himalayan Component

Sl. No. Name of the Link Status Country/ States benefited Annual Irrigation

(Lakh ha)

Hydro

power

(MW)

1. Kosi-Mechi link PFR completed Bihar & Nepal 4.74

(2.99+1.75)

3,180
2. Kosi-Ghaghra link Draft FR completed Bihar, Uttar Pradesh (UP) & Nepal 10.58

(8.17+ 0.67 + 1.74 )

3. Gandak – Ganga link FR completed

(Indian portion)

UP & Nepal 34.58

(28.80+ 5.78)

4,375 (Dam PH) & 180 (Canal PH)
4. Ghaghra – Yamuna link FR completed (Indian portion) UP & Nepal 26.65

(25.30 + 1.35 )

10,884
5. Sarda – Yamuna link FR completed UP & Uttarakhand 2.95

(2.65 + 0.30)

3,600
6. Yamuna-Rajasthan link FR completed Haryana & Rajasthan 2.51

(0.11+ 2.40 )

7. Rajasthan-Sabarmati link FR completed Rajasthan & Gujarat 11.53

(11.21+0.32)

8. Chunar-Sone Barrage link Draft FR completed Bihar & UP 0.67

(0.30 + 0.37)

9. Sone Dam – Southern Tributaries of Ganga link PFR completed

 

Bihar & Jharkhand 3.07

-(2.99 + 0.08 )

95 (90 Dam PH) & 5 (Canal PH)
10. Manas-Sankosh-Tista-Ganga (M-S-T-G) link FR completed Assam, West Bengal (WB) & Bihar 3.41

(2.05 + 1.00 + 0.36 )

11. Jogighopa-Tista-Farakka link (Alternative to M-S-T-G) PFR completed Assam, WB & Bihar 3.559

(0.975+ 1.564+ 1.02)

360
12. Farakka-Sundarbans link FR completed WB 1.50
13. Ganga(Farakka) – Damodar-Subarnarekha link FR completed WB, Odisha & Jharkhand 12.30

(11.18+ 0.39+ 0.73)

14. Subarnarekha-Mahanadi link FR completed

 

WB & Odisha 1.63

(0.18+ 1.45)

9

For more updates Click Here