Arun-3 Hydroelectric Project

Context:

Recently, India and Nepal inaugurated the start of electromechanical works at the Arun-3 Hydroelectric Project.

About the Arun-3 Hydroelectric Project:

  • It is located on the Arun River (a tributary of the Kosi River)ย in Sankhuwasabha District of Eastern Nepal.

  • It is a 900 MW Run-of-River hydroelectric project.

  • It is beingย developed with Indian assistanceย at a cost of Rs. 144 billion.
  • Being developed by SJVN Arun-III Power Development Company (SAPDC), a subsidiary of Indiaโ€™s Satluj Jal Vidyut Nigam (SJVN).

  • The project is based on the Build-Own-Operate-Transfer (BOOT) model for 30 years, including 5 years for construction.

  • Represents deepening India-Nepal energy collaboration and cross-border infrastructure partnership.

Prelims Question:

Q. The Arun-3 Hydroelectric Project, jointly developed by India and Nepal, is located on which river?
(a) Gandaki
(b) Bagmati
(c) Arun
(d) Sapt Kosi

Answer: (c) Arun

Leave a Reply

Your email address will not be published. Required fields are marked *